M. Hamzawy
BACK TO AUDITS
[ harvest ]

European Hatchery Equipment Manufacturer

Europe · Timeline: 6 weeks

Score 34 /100
Triage CRITICAL
The audit identified three revenue leaks we'd been missing for two years. We fixed the lead capture issue in a week and saw qualified inquiries increase by 40% within 30 days.
— Director of Operations

Revenue Leaks & Remediation

01 /

Lead Capture Architecture

Finding (Before)

Contact form hidden behind 3 navigations — no first-time visitor could find it without guidance from a sales rep.

Fix (After)

Moved lead capture to hero section, added secondary CTA in footer, implemented exit-intent modal.

Measured Impact

280% increase in contact form submissions

02 /

Technical Spec Accessibility

Finding (Before)

Product spec sheets only available as PDF downloads that didn't render on mobile. Procurement engineers on smartphones had no way to evaluate products.

Fix (After)

Built spec-sheet viewer with mobile-responsive tables, added searchable spec database.

Measured Impact

Spec sheet views increased 340%

03 /

Competitive Differentiation

Finding (Before)

No comparison data against incumbent brands. Procurement teams evaluating the equipment couldn't justify switching without manually building a comparison spreadsheet.

Fix (After)

Added comparison engine showing spec-by-spec differences vs 3 leading competitors.

Measured Impact

Demo requests from procurement teams increased 60%

Is your site leaking inquiries?

Let's run your platform through the HARVEST diagnostic to identify where qualified buyers are falling out of your flow.

Get Your Audit →